Skip to content
TimeQeeper

Modules · Safety & compliance

Permits to work and LMRA, linked to execution.

A digital permit to work belongs with the work, not in a separate folder. In TimeQeeper you request the permit, sign per role and link it to the work order, with the LOTO measures and last-minute risk assessment (LMRA) questions alongside and a logbook of who did what, and when.

Work permit WV-2026-042

Active

Linked to WO000014 — Compressed air inspection

Asset: Compressor C1 · Machine room

Provider's measures

  • Electrically isolated (LOTOC)
  • Gas measurement entered
  • Flammable material removed
LOTOC boxPersonal lock · J. Bakker

Signed by provider and holder

Digital permit to work

What a digital permit to work gives you.

A paper permit can only be in one place at a time, and afterwards it is hard to see who checked what. In TimeQeeper the permit to work is a record that anyone with access can open, with its status, measures, signatures and linked work orders. That gives you a firmer grip on what has been released and which permits are active right now.

Authorised signing

You appoint who may sign as requester, issuer, provider or co-signer, with an end date if you want one. With that check on, only someone holding the role or administering the module can sign.

Measures first

The provider can only sign once all required measures are marked ready and the requested gas measurements have been entered.

Linked to the work order

From the work order you create a permit or link an existing one. For starting and completing the order you decide whether TimeQeeper does nothing, warns or blocks.

Always the current status

Draft, to be issued, issued, active, ended or withdrawn, and expired as soon as the validity has passed. The To sign list shows what is waiting for you.

Less retyping

Copy an earlier permit for recurring work. Work methods, measures and PPE come from lists you manage yourself.

Easy to retrieve

Every permit has a logbook and a PDF. You can search the list of permits and export it to Excel.

How it works

From request to return, in six steps.

The steps follow the roles on the permit. You can always see who the permit is waiting for, and whoever is next gets an alert in the app.

  1. 1

    Request

    The requester describes the work, chooses the asset, the contractor and the holder, and ticks the work methods. A high-risk work method makes the whole permit high risk, and a task risk assessment (TRA) is then required by default.

  2. 2

    Issue

    The issuer reviews the request and the required measures, and issues the permit or rejects it with a reason. Co-signers, such as a safety specialist, sign as well.

  3. 3

    Measures

    The provider marks the measures as ready: isolation, pipework and equipment, fire detection, surroundings. Measured gas values are added.

  4. 4

    Sign and activate

    Provider and holder sign. The holder does so on screen or on the printed permit. With both signatures the permit is active.

  5. 5

    Extend and transfer

    If the work runs on, you extend per period, with signatures from provider and holder. If needed, you transfer the holder once.

  6. 6

    Return

    Once the workplace has been cleared, holder and provider sign for the return and the permit has ended. It can be withdrawn while it is open, with a reason.

Contents

What the permit to work contains.

The permit is laid out the way many industrial companies know it: a separate part for each person responsible. The lists in it, such as work methods, equipment, measures, PPE and gases, are yours to manage, with a standard list to start from.

Request

Description of the work, permit type such as hot work or confined space, validity, number of people, asset and location, contractor and holder, work method, equipment used and special procedures.

Provider measures

Product and GHS pictograms, isolation (LOTOC), pipework and equipment, fire detection and extinguishing systems, surroundings and gas measurements per substance. For each measure: needed and ready.

Holder measures

Precautions such as cordoning off, a manhole or fire watch, spark-free tools and a personal lock on the LOTOC box, plus the additional personal protective equipment.

Authorisation

The signatures of requester, issuer, co-signers, provider and holder, and the extensions.

Close-out

Work finished, workplace cleared and left safe, and the signatures on return.

Attachments and PDF

Attachments to the permit and an A4 PDF: the form on the front, the LMRA on the back.

Industrial worker in a safety vest and hard hat by heavy machinery
LMRA & LOTO

The final check, with the permit at the workplace.

You carry out the last-minute risk assessment (LMRA) just before the work, on the spot. You manage the questions in TimeQeeper and they appear on the back of the permit PDF, with a signature table for the crew. LOTO is a fixed part of the permit: under LOTOC it records, per type of energy, what has to be isolated and whether that is ready. How LMRA, LOTO and the permit fit together is explained in safe maintenance.

  • LMRA questions you manage yourself, with a standard list to start from
  • Isolation per type: electrical, mechanical, hydraulic and pneumatic, each with needed and ready
  • LOTOC box or key cabinet and personal lock on the permit
Accountability

Evidence lives in the system, not in binders.

Permissions per module and the roles on the permit control who may do what; the logbook records who did what, and when. If you change a permit after submitting it, the signatures so far lapse and it is signed again. When the auditor arrives, the answer is a PDF and a logbook rather than a search party.

  • Logbook per permit: who did what, and when
  • Permissions per module and authorisations per role
  • Permits as a source in your KPI dashboards: status, risk and validity
FAQ

Frequently asked questions about safety and compliance

What is a digital permit to work?

A permit to work that you request, review and sign in software instead of on paper. In TimeQeeper it is a record with status, measures and signatures, linked to the work order and the asset.

Where are permits to work created?

In the Permits module, or straight from the work order, which is then already filled in. You can link an existing permit to one or more work orders.

Can a work order start without a valid permit?

That is up to you. For each organisation you set whether TimeQeeper does nothing, warns or blocks when a work order that requires a permit is started or completed.

Who signs a permit to work?

The requester submits, the issuer issues, any co-signers sign too, and provider and holder sign to make the permit active. Employees sign with a confirmation or their password; the holder, often an external contractor, on screen or on paper.

How do we record LMRA and LOTO?

The LMRA questions are on the back of the permit PDF, with a signature table for the crew. LOTO is on the permit itself: under LOTOC it lists per type of energy what has to be isolated, and the provider marks it as ready. There is more background in safe maintenance with LMRA and LOTO.

How long is a permit valid?

That is a rule of your organisation: a number of hours from the start, calendar days or calendar weeks. You extend per period, up to the maximum you set. Once the validity has passed, the permit shows as Expired.

Can we match the permit to our own procedures?

Yes. Work methods, equipment, measures, PPE, gases, LMRA questions, co-signer functions and permit types are lists you manage yourself.

What can we show an auditor?

The permit as a PDF, the logbook of who did what and when, the signatures per role and the linked work orders. You can export the list of permits to Excel.

Does safety remain a separate set of records?

No, that is exactly the point. The permit hangs off the same work orders and assets as the rest of maintenance and is a source in your dashboards, so there is no second set of records running alongside.

Ready for more control over your maintenance?

Book a tailored demo. We'll show how TimeQeeper fits your machines, way of working and team, and we'll get in touch quickly.

We use functional storage and cookieless statistics. With your consent, LinkedIn measures visits and demo requests and helps us show relevant ads. LinkedIn may link this data to your profile.

Functional storage and cookieless statistics
Always available
LinkedIn marketing
Disabled

Your choice lasts 180 days. Declining does not affect the website or your demo request. You can change your choice here at any time.

Privacy statementCookie statement