FMECA (Failure Mode, Effects and Criticality Analysis) is a structured method for determining how a system can fail, what the consequences are and which failure modes deserve the most attention. It is an FMEA with one extra step: you rank the failure modes by criticality. For technical organisations, FMECA is one of the fundamental tools for setting up maintenance and reliability on a sound basis rather than on gut feeling.
This article explains what FMEA and FMECA are, why you carry out the analysis, how to build it step by step, what a worked example looks like and how to translate the results into a concrete maintenance plan.
FMEA and FMECA: what the C adds
FMEA (Failure Mode and Effects Analysis) identifies, per component or function, which failure modes can occur and what effects they have on the system and its surroundings. The result is a structured overview of "what can go wrong and what happens if it does".
FMECA adds an explicit criticality analysis: the "C" for Criticality. Instead of treating all failure modes as equal, you quantify how critical each failure mode is, through a combination of severity and probability, optionally supplemented with detectability. This produces a ranking that shows which failure modes actually dominate your risk. FMEA tells you what can happen; FMECA also tells you what matters.
| Feature | FMEA | FMECA |
|---|---|---|
| Main question | what can go wrong and what happens then? | the same, plus: what is most critical? |
| Result | overview of failure modes and effects | ranking of failure modes by criticality |
| Scores | not required | at least severity, often occurrence and detection too |
| Use | mapping failure modes | prioritising and underpinning maintenance |
The standard IEC 60812 covers both: an analysis is called an FMECA once the ranking of criticality includes at least the severity of the consequences. In practice the line is blurred: many FMEAs include a risk score, in which case you are effectively doing an FMECA. How to carry out an FMEA step by step, with a template and a worked example, is covered in FMEA analysis.
Why you carry out an FMECA
A well-executed FMECA serves several purposes at once:
- Determining criticality: you objectively reveal which components and failure modes have the greatest impact on safety, availability, quality or cost.
- Underpinning the maintenance strategy: for each failure mode you decide specifically whether preventive, condition-based or corrective maintenance is appropriate, instead of applying the same approach everywhere.
- Prioritising risks: with limited time, budget and staff, you focus attention where the return is highest.
FMECA is therefore not an end in itself but a means to allocate scarce resources sensibly.
The steps of an FMECA
1. Functions and system boundaries
Start by defining the system boundaries and naming the functions. Describe what an installation, subsystem or component must do (for example "pump medium at a flow rate of X"). A clear function definition is essential: a functional failure is the inability to perform a function, and failure modes are the specific ways in which that happens. Deliberately choose an analysis level: too high and you miss relevant failure modes, too low and the analysis becomes unworkable.
2. Failure modes
For each function, determine how it can fail. A failure mode describes the way in which a function is no longer fulfilled: a bearing seizes, a seal leaks, a sensor drifts, a valve fails to close fully. Be specific and distinguish failure modes that have different causes or consequences.
3. Effects
For each failure mode, describe the consequences at several levels: local (on the component), at system level, and on the surroundings or the business process. Think of production downtime, safety risks, quality loss or consequential damage. The effects will later determine the severity score.
4. Causes
For each failure mode, trace the underlying causes: wear, contamination, incorrect loading, assembly errors, material fatigue. The cause determines whether, and how, you can prevent or detect a failure mode. Without insight into causes, the choice of measures remains guesswork.
5. Assessment: severity, occurrence, detection and RPN
Now you score each failure mode. Three dimensions are common, usually on a scale from 1 to 10:
- Severity: how serious are the consequences if the failure mode occurs?
- Occurrence: how often is the cause expected to occur?
- Detection: how well can you notice the failure mode, or its onset, in time? Note: a high score here means poorly detectable.
The product of these three gives the Risk Priority Number (RPN): RPN = severity × occurrence × detection. The RPN therefore ranges from 1 to 1000 and offers a relative ranking. In a strict FMECA you often use a criticality score based mainly on severity and probability; the RPN is the most widely used practical variant. Treat the outcome as an aid to prioritisation, not as absolute truth: a failure mode with extremely high severity deserves attention even if its RPN is moderate. Because the same RPN can hide very different risks, the AIAG and VDA FMEA Handbook (2019) replaces the RPN with an action priority (AP), in which severity carries more weight.
6. Measures
For the failure modes with the highest criticality you define measures. These can address severity (change the design, limit consequences), occurrence (remove the cause, intensify maintenance) or detection (inspections, condition monitoring, sensors). Assign an owner and a deadline to each measure, and reassess the score once the measure has been implemented.
Example: an FMECA of a cooling water pump
This is what the method looks like for one cooling water pump with no standby pump. The numbers are example scores on a scale from 1 to 10.
Function: pump cooling water at a minimum of 50 m³/h. Functional failure: the flow drops below 50 m³/h or stops altogether. Four failure modes, with their effect and cause:
- Bearing seizes: the pump fails and the line stops within an hour. Cause: wear or poor lubrication.
- Seal leaks: cooling water ends up on the floor, but the pump keeps running and the leak is spotted on the round. Cause: wear of the mechanical seal.
- Impeller wears: the flow falls gradually and cooling weakens. Cause: erosion from dirt in the water.
- Coupling breaks: the pump fails without warning. Cause: misalignment or fatigue.
Next you score each failure mode. Criticality here is severity × occurrence; the RPN multiplies that by detection, where a high score means poorly detectable:
| Failure mode | Criticality (S × O) | D | RPN |
|---|---|---|---|
| Bearing seizes | 8 × 4 = 32 | 5 | 160 |
| Seal leaks | 5 × 6 = 30 | 2 | 60 |
| Impeller wears | 4 × 5 = 20 | 6 | 120 |
| Coupling breaks | 8 × 2 = 16 | 7 | 112 |
The two rankings differ, and that is instructive. The seal comes second on criticality, but its RPN is low because everyone can see a leak. The impeller has less serious consequences, but without flow measurement you notice the wear late, so its RPN is high.
The scores point to a measure for each failure mode, after which you score again:
| Failure mode | Measure | What changes | New RPN |
|---|---|---|---|
| Bearing seizes | measure vibration every four weeks | D from 5 to 2 | 8 × 4 × 2 = 64 |
| Impeller wears | measure flow and follow the trend | D from 6 to 2 | 4 × 5 × 2 = 40 |
| Coupling breaks | align at assembly, check at every stop | O from 2 to 1 | 8 × 1 × 7 = 56 |
| Seal leaks | deliberately corrective, spare in stock | nothing | 5 × 6 × 2 = 60 |
The seal deliberately gets no extra task: the leak announces itself, the consequences are limited, and replacing it once the leak shows is cheaper than a fixed interval. An outcome like that is exactly what the analysis is for.
From FMECA to a concrete maintenance plan
The real value of an FMECA only emerges when it is translated into maintenance. For each critical failure mode you determine the most suitable maintenance type:
- If the failure mode is predictable and time-related, preventive maintenance (fixed intervals) is the obvious choice.
- If the failure mode shows a measurable onset, condition-based maintenance is more effective: you intervene based on vibration, temperature, oil analysis or other indicators.
- If the consequences are limited and the cost of prevention is high, deliberate corrective maintenance (run to failure) may be the wisest choice.
This links each measure to a task, interval or measurement limit. See also the difference between preventive vs corrective maintenance. The resulting tasks are then often managed in a maintenance management system; read more about what a CMMS is.
FMECA in a spreadsheet or in software
A first FMECA works fine in a spreadsheet: one line per failure mode, with function, effect, cause, scores and measure. That breaks down as soon as you analyse several installations or want to keep the analysis up to date: versions drift apart, scores become hard to compare and measures sit apart from the maintenance plan. FMECA software records the analysis per asset and links measures to your maintenance plans. Choose what suits the scale of your analysis; the method stays the same.
Practical tips and pitfalls
- Too detailed: anyone who analyses every screw drowns in work and loses overview. Choose an analysis level that matches the decision you want to support. Start with the installations that matter most, identified beforehand with an asset criticality analysis.
- Subjective scores: severity, occurrence and detection are often filled in by feel. Use clear scoring criteria and, where possible, coded failure data to substantiate the scores.
- A one-off exercise: an FMECA that disappears into a drawer after commissioning quickly becomes outdated. Treat it as a living document that you update after incidents, changes and new insights. A root cause analysis after an incident often turns up a failure mode that was still missing.
- Analysis without follow-up: scores without measures achieve nothing. The criticality ranking is a starting point, not an end product.
Relationship with RCM
FMECA often forms the analytical heart of RCM (Reliability-Centered Maintenance). RCM uses the failure modes, effects and criticality from the FMECA and adds a decision tree to select the most effective maintenance task for each failure mode. You can apply FMECA on its own, but within an RCM programme the analysis gains an explicit link to maintenance decisions. FMECA provides the insight, RCM the systematic approach to turn it into a maintenance concept.
Frequently asked questions
What is the difference between FMEA and FMECA?
FMEA maps failure modes and their effects. FMECA adds a criticality analysis, allowing you to rank failure modes quantitatively based on severity and probability. FMECA is therefore an FMEA plus prioritisation.
What does the Risk Priority Number (RPN) mean?
The RPN is the product of severity, occurrence and detection, each scored on a scale from 1 to 10. It ranges from 1 to 1000 and gives a relative ranking of failure modes. Use it as a prioritisation aid, not as an absolute risk value.
How often should you update an FMECA?
Treat an FMECA as a living document. Update it after relevant failures, design changes, adjustments to the maintenance plan and periodically, for example annually. This keeps the scores and measures aligned with the real situation.
Is FMECA the same as RCM?
No. FMECA is an analysis method for failure modes and criticality. RCM is a broader methodology that uses an FMECA as its basis and, with a decision structure, determines the most suitable maintenance task for each failure mode.
Do you need software for an FMECA?
No, the method also works on paper or in a spreadsheet, and for one installation that is often enough. Software pays off once you analyse several installations, want to keep the analysis alive after failures and changes, and want to see measures back in your maintenance plans and work orders.