Maintenance KPIs are measurable indicators that show how well your maintenance performs: how available your equipment is, how reliably your assets run, how much work you have under control and what it costs. You use them to make decisions, not to collect numbers: the value is not in the number itself, but in the decision that follows from it. This article lists the key maintenance KPIs, groups them by what they measure, shows how to manage by them and how to pick a small, meaningful set.
KPIs are the steering instrument of maintenance management. Most fall into four groups: availability and reliability, effectiveness, work control and cost. The figure below summarises them.
Availability and reliability
This group answers the most direct question: does the equipment run when you need it, and how often does it fail?
Availability (%) is the share of planned production time that an asset was actually usable. You calculate it as uptime divided by uptime plus downtime. An availability of 96% means the asset was unavailable for 4% of the planned time. It is an outcome KPI: it captures the combined effect of failures, repairs and waiting time in a single figure.
MTBF (Mean Time Between Failures) measures reliability: the average time between the starts of two consecutive failures, including the repair. If MTBF rises, an asset fails less often. MTTR (Mean Time To Repair) measures recovery: the average time to resolve a failure, from the moment it occurs until the asset works again. A long MTTR often points to missing parts, unclear procedures or too little capacity, rather than to the fault itself.
Availability, MTBF and MTTR are connected: higher MTBF and lower MTTR together lead to higher availability. Measuring them side by side shows you not only that an asset fails, but whether the problem lies in the frequency or in the repair time. The formulas and pitfalls are covered in more detail in the article on MTBF and MTTR.
Effectiveness: OEE
Availability tells you whether a machine ran, but not whether it ran well. For that you use OEE (Overall Equipment Effectiveness). OEE combines three factors into one percentage: availability (did the machine run), performance (did it run at speed) and quality (was the product good). You multiply the three: a machine scoring 90% on all three lands at roughly 73% OEE.
The strength of OEE lies in that breakdown. A low performance score points to minor stops and speed loss; a low quality score to rejects and rework. That tells you where the loss sits. OEE is most useful on production lines with a clear cycle time; on standalone assets without a fixed production norm it says less. What OEE measures exactly and how to calculate the factors is explained in our article on OEE.
Work control
This group is not about the machine, but about your own process: is the work under control, or are you constantly playing catch-up?
The preventive/corrective ratio (PM ratio) shows what share of your maintenance hours goes to planned work and what share to breakdowns. An organisation that mostly works reactively recognises itself in a high share of corrective work. Many maintenance teams aim for a majority of preventive and condition-based work, but the right ratio depends on your assets. The difference between the two is covered in the article on preventive vs corrective maintenance.
Backlog is the volume of approved but not yet executed work, expressed in labour hours or, more comparably, in weeks of capacity: backlog hours divided by the hours available per week. Many teams treat 2 to 4 weeks as a healthy range. A backlog is not a problem; a growing or invisible one is. The figure shows whether your capacity and work intake are in balance.
Schedule compliance measures what share of planned work was actually carried out as planned. Low schedule compliance means urgent work keeps overriding your schedule, a sign that you are still working reactively. Together these KPIs tell you whether your maintenance is controllable or whether it is happening to you.
Cost
Ultimately maintenance has to stay affordable without giving up reliability. Two KPIs keep an eye on that.
Maintenance cost as a percentage of replacement asset value (RAV) sets your annual maintenance cost against the replacement value of your assets. This ratio makes cost comparable between sites or years, regardless of the size of your asset base. If this percentage rises without reliability improving, that is a signal to look at where the money is going.
Cost per asset brings spending down to the level of the individual machine or installation. That shows which assets cost disproportionately much and which are candidates for replacement or a different maintenance strategy. Cost figures only become useful alongside reliability KPIs: cheap maintenance that drives up failures is not a saving.
How to manage reliability, availability and maintenance cost
You manage reliability, availability and maintenance cost by always looking at all three together and tracing every deviation back to a cause and an action. They are connected: cut only the cost and the failures come back later; watch only availability and you miss an asset that fails more and more often.
An example. A pump has an MTBF of 900 hours and an MTTR of 12 hours: (900 − 12) / 900 ≈ 98.7% availability. A year later the MTBF has dropped to 600 hours, with the same MTTR: (600 − 12) / 600 ≈ 98.0%. Availability falls by less than one percentage point, while the pump fails one and a half times as often. Anyone following availability alone won't see that.
So decide for each management question which figures you look at and what you do when they deviate:
| Question | Look at | If it deviates |
|---|---|---|
| Does the asset fail too often? | MTBF, failures per asset | analyse the recurring failure, review the maintenance plan |
| Does recovery take too long? | MTTR, availability | measure waiting for parts and people separately, improve preparation |
| Is the money going to the right place? | cost per asset, % of RAV | assess the most expensive assets: repair, replace or change maintenance |
| Is the work under control? | PM ratio, backlog, schedule compliance | balance capacity and workload, reduce urgent work |
Turn it into a fixed cycle, for example monthly:
- Look at the trend per asset, not just the average for the whole plant. Put the ten assets with the most downtime or the highest cost at the top.
- Find the cause. Check the work orders and failure codes to see whether the same failure mode keeps coming back.
- Choose one action per deviation, with an owner and a date: a root cause analysis, a different interval, an extra part in stock or a replacement proposal.
- Measure the effect after a fixed period, for example a quarter, and adjust the action if the figure doesn't move.
Pick a few KPIs that matter
Measuring more does not mean managing better. A dashboard full of numbers nobody uses is a collection of vanity metrics: it looks complete, but leads to no decision. A KPI without action is dead weight.
So choose a small number of KPIs that match a concrete goal. If you want to reduce unplanned downtime, availability, MTBF, MTTR and the PM ratio are enough. If you want to get a grip on costs, add maintenance cost as a percentage of RAV and cost per asset. Make sure every KPI has an owner, a target value and a clear source, and that someone acts on it periodically. A KPI that stays red for three months with no consequence no longer measures anything useful.
For those wanting to benchmark against a standard: the European standard EN 15341 describes a set of standardised maintenance KPIs (economic, technical and organisational) and is available from national standards bodies, for example as BS EN 15341 in the UK or NEN-EN 15341 in the Netherlands. Such a standard is not mandatory, but a handy framework for deciding which indicators are relevant for your organisation.
Reliable KPIs start with reliable data. When failures, work orders and hours are logged consistently in one system, you can reliably derive and track most of these indicators in reports and dashboards. Data logged loosely across scattered lists leads to figures nobody trusts, and therefore to KPIs nobody acts on.
If you also manage spare parts, stock accuracy belongs in your set; how to measure it is explained in cycle counting.
Frequently asked questions
What makes a good maintenance KPI?
A good maintenance KPI comes from your own work orders and failure data, has an owner and a target, and leads to an action when the figure changes. Using the same definition across all assets and periods matters more than the exact choice: an MTBF calculated differently every month says nothing about the trend.
How many KPIs should you measure in maintenance?
Fewer than you think. Start with four to six KPIs tied to one concrete goal, each with an owner and a target. Only expand once you actively use those to make decisions. A large dashboard nobody consults changes nothing.
What is the difference between a KPI and a vanity metric?
A KPI leads to a decision or action; a vanity metric looks complete but changes nothing about what you do. The test is simple: if a number changes, does anything change in your approach? If not, it is dead weight.
Which maintenance KPI is the most important?
There is no universally most important KPI; it depends on your goal. For availability problems MTBF and MTTR lead, for production lines OEE, for cost control maintenance cost as a percentage of RAV. Choose the KPI that measures the problem you want to solve.